Closed front bore under the A2 motorway

This project involved the trench-free installation of a water pipe with a diameter of 1,600 mm at Hmp. 58.0 under the A2 motorway. The bore was part of the project to provide for drainage while the A2 motorway is being moved. The work was limited to realising the water pipe with a diameter of 1,600 mm with three drains with connections.

Client:
Eneco Energie Infra Utrecht BV
Location:
Utrecht
1 Bouwterrein
3 Persinstallatie
4A Ontvangst boorkop
6A Put met uitstroomvoorziening
6B Put met uitstroomvoorziening